Disneyland Main Street
Anaheim, CA
- Project: Retaining Wall Tieback
- Owner: Disneyland Resort
- Structural Firm: AECOM
- Geotechnical Firm: Leighton Consulting, Inc.
- Certified Installer: Construction Services, Inc.
- General Contractor: Dorado Construction
Project Description: January 2011 - Tiebacks at retaining wall behind the Lincoln Theatre on Main Street USA
Scope Of Work: Original retaining wall was stabilized with temporary shoring. After soils and load testing were completed, seven tieback anchors were drilled into the existing, adjacent slope. Anchors were then bolted to new concrete retaining wall, finish façade applied, landscaping and wrought iron fencing installed. Project was performed in the night during park closure hours and completed ahead of schedule in two days.
Installation of tieback
Tension load tieback
New wall brown coated
New wall with theme plaster